Manufacturing AI / Heat Treatment / HT-2026-041
JE
J. Engineer
Optimization

Process Route

Engineer the full sequence from preheat through final cooling, with stage-level constraints.

Route sequence

HT-2026-041 · Draft v1.2

1
Preheat
650°C · 30 min
Validated
2
Austenitize
845°C · 42 min
Optimized
3
Quench
40°C · ≤ 8 s transfer
Recommended
4
Temper
560°C · 120 min
Optimized
5
Final Cool
Air · To ambient
Standard
Transfer-time gate
Quench transfer is constrained to ≤ 8 s from furnace discharge to immersion.

Selected stage · Austenitize

Stage 02

Atmosphere: controlledCore temperature modeled