Manufacturing AI / Packaging Engineering
05 · Test & export
Package the decision for the real world.
Generate the engineering report, test sequence, CAD bundle and an RFQ-ready BOM.
Test plan
ISTA 3A · draft sequence
1. Conditioning
2. Random vibration
3. Drop sequence
4. Inspection
Engineering report
12 pages · assumptions included
Key conclusion
Variant B meets the current simulation constraints.Manufacturing hand-off
BOM + RFQ + supplier package
Release checklist
READY FOR REVIEW| Artifact | Version | State |
|---|---|---|
| Parametric CAD | v3 | Ready |
| Packaging BOM | v3 | Ready |
| Simulation report | v5 | Ready |
| Test plan | v2 | Review |
| Assumption log | v1 | Review |